Piling is used to strengthen the soil on ground and able to support the load of building. Piles have to be driving into the ground by using piling machine, there is few different types of piling machine in the market and all of them have different usage. The usage of types of piling machine is depending on the type of piles used, different types of piling machine may affect the procedure of pile driving too. Location of site affect the usage of type of piling machine too, because some of the piling machines make noisy voice and it may affect the nearby resident.
Type Of Piling Machine
1) Bakau Piling Machine

Features :
i) It’s using a type of timber called “Bakau” as pile.
ii) Normally used for single storey house which has lower load.
iii) Lower cost spent.
2) Pile Driver

Features :
i) Hydraulic Pile Driver (long screw drilling machine)
ii) Can drive with longer pile with height of : 21m, 25m, 27m, 30m, 30.4m, 33m, 34m, 36m
iii) Hole diameter : 400mm, 600mm, 800mm, 1200mm
iv) Drilling depth : 17m, 20m, 23m, 26m, 30m, 32m
v) Piling speed : 3.5m/min, 4m/min
3) Rotary Piling Rig

Features :
i) It’s commonly used for railway, road,bridge, public works bridge and large building, etc.
ii) Maximum Hole diameter : 2000mm
iii) Maximum Drilling depth : 60m
iv) Piling speed : 1.5km/hour
v) Efficient and energy-saving engine
4) Nissha D308 / 408 / 508 Piling Machine

Features :
i) Used for spun pile, RC square pile and etc.
ii) Fast driving speed and efficient.
5) Bore piling machine (JZL18-600/JZL45 Crawler type)

Features :
i) It’s used for bored piling.
ii) Bored diameter : 600mm
iii) Bored depth : 18m
iv) Stanchion height : 20.6m
v) Multifunctional Pile Frame
6) Bore piling machine (JZL18-600/JZL45 Crawler type)

Features :
i) It’s used for bored piling.
ii) Bored diameter : 600mm
iii) Bored depth : 21m
iv) Stanchion height : 25.3m
Thanks the following website for providing useful information.
Source : EC21 | Alibaba
Archived under Piling, Piling Machine
Posted by Harry Lee on March 9, 2009 at 12:29 pm
There is many different type of piles in the market, every type of piles has their own procedure of pile driving. Many contractors are not expert in how to drive a pile or procedure of pile driving. Here is a rough procedure on how to drive a pile. Before the piling process is carrying on, soil investigation have to be carried on, so that piling contractor knows what is the condition of soil. If it’s normal soil then the normal piling procedure can be carried on, but if the soil contains rock or stone, another piling procedure will be carried on. The cost for that also will be affected.
Procedure Of How To Drive A Pile
1) Mob Or Bringing Piling Machine To The Site
Firstly, clarify the location that the piling machine has to be moved to. After that, the piling machine will be moving in to the location in site. The piling machine will be set on place.
2) Driving Initial Pile
After bringing in the piling machine, first pile or starter pile or initial pile will be ready to drive in to the ground by following the pile point that shown in the construction drawing. The initial pile will be driven in to the ground until maximum or can’t be driving in anymore.
3) Driving Extension Pile
If initial pile has been fully driving in to the ground, the second pile or extension pile will be jointing to the initial pile and drive again. The extension pile will be driving into the ground until maximum as the initial pile.
4) Cutting Off Pile Head
Let’s say the 6 metres extension pile has been driving in to the round 3 metres depth only and can’t be driving in anymore. The excessive of 3 metres extension pile will be cutting off.
5) Preparation Of Pile Head Or Pilecap
After cutting off the excessive pile, excavate the soil surrounding of the pile about 300mm depth for preparation of pilecap.
6) Load Test
The purpose of load test is to test the strength of the pile. A certain load will be putting on the pile for a certain period. If the concrete pile is crack, which mean the concrete pile is failed to support the load. If the concrete pile left for certain days without any crack, which mean the concrete pile is strong enough to carry the load of the building. Normally load test will be carried on before driving the pile to the ground. If the load test for the concrete pile is failed, then the contractor has to supply another batch of concrete piles.
Archived under Piling